Rock removal at OR 58 Salt Creek Tunnel
/OAKRIDGE, Ore. – Crews are removing loose and hazardous rocks from the hillsides at both ends of the OR 58 Salt Creek Tunnel beginning Saturday, Sept. 7 through Sunday, Sept. 15. All work will be done during the day, with lanes closed for safety as needed around the tunnel at milepost 56. Expect work zone delays of up to 20 minutes.
Read More